This job consisted of the following technical build and finishes
- underpinning
- delta membrane system and ground water pumps within structure
- cavity concrete wall construction to provide finishes aswell as structure. Membranes concealed within. Ledges built with cold bridge details
- exposed Douglas fir joists which also were structurally supporting roof
- cavity bloc gym in garden clad with timber and ventilated cavity
Read less