Scope of Work:
• Groundworks and trench foundations
• Concrete pour
• Cavity wall construction
• Steel RSJs and timber joists installation
• Structural and finishing works
Foundations
We began by excavating the site and pouring concrete to create a solid, level foundation.
Brickwork
We built cavity walls using high-quality face bricks and blocks, ensuring strength and a clean finish.
Steel Frame
Steel RSJs and posts were installed to support the new roof structure.
Timber Roof Joists
Treated timber joists were laid across the span to form the roof base.
Next Steps
We’ll complete the roof, install windows and doors, and begin internal works before final handover.
Read less