The project was carried out on a grade 2 listed building, a specialty of the team.
We started by taking down the old conservatory, to be rejuvenated.
Then the new room which is timber frame needed to be built in the clients garden due to limited and narrow access routes.
Finally the stud wall was tiled with brick slips and grouted to give the impression of an aged brick wall.
The outside was then finished in zinc sheets and the roof lights were triple glazed with solar reflecting glass.
Finally we fitted the grey aluminium doors.
Finishing off the modern addition to the building.
Read less